Arch 1 and 2: Lumber Wall Details - Term 3

Is this your test? Login to manage it. If not, you can develop a test just like it.

This is a non-interactive preview of the quiz content.

1.
10 points
The purpose of the JACK STUD is to support the ____________.
2.
10 points
The ROUGH OPENING HEIGHT for a door is 6'8".
3.
10 points
The component that is placed at the top of any door or window rough opening (for support) is called the ________________.
4.
10 points
Kiln-dried lumber, such as a 2"x6" is actually less than it's stated size, which in this case 1 1/2" x 5 1/2".
5.
10 points
A full-length stud is called a _____________ stud.
6.
10 points
The small scrap pieces that exist on any home construction site can used as BLOCKING.
7.
10 points
The small framing component that is the bottom of a window rough opening is called a ____________.
8.
10 points
The top and bottom ____________ are part of the overall wall system.
9.
10 points
A CRIPPLE can only be used over a door - never below a window sill.
10.
10 points
The overall HEIGHT of the lumber wall is 8' 1".