2013 Annual FS Training

Is this your test? Login to manage it. If not, you can build an assessment just like it.

This is a non-interactive preview of the quiz content.

1.
1 point
Which of these statements is FALSE?

For synchronous opening applications...
2.
1 point
SCS firmware upgrades require an EEPROM change.
3.
1 point
The major difference(s) between the CBS and the CBS Lite is/are...
4.
1 point
The 'CSA' in CBS Lite CSA stands for...
5.
1 point
When the breaker is installed backwards (180 degree rotation) in relation to the engineering diagrams...
6.
1 point
The CBS Lite CSA is currently available for sale.
7.
1 point
In regards to synchronous opening, auxiliary switches changing state prior to the trip coils being energized is a sign of what?
8.
1 point
Which statements is FALSE...
9.
1 point
Which statement is TRUE?
10.
1 point
The latest version of CB Insight ...
11.
1 point
A customer would need only one SCS unit in his breaker if he wanted to sync close and sync open a capacitor bank.
12.
1 point
Which statement does NOT belong...
13.
1 point
The CBS-F6 is designed to be used specifically on ABB breakers.
14.
1 point
The SCS needs to be jumpered out in order to not impact timing.
15.
1 point
The SCS Bypass time is configurable via CB Inisght.
16.
1 point
The CBS can be installed on competitor breakers
17.
1 point
Regardless of product type or the nature of alarm, the first thing to do is...
18.
1 point
For synchronous closing applications, low current levels...
19.
1 point
Which of the following statements is FALSE...

For the SCS, a tell-tale sign that the coil/current relationship is incorrect is...
20.
1 point
Which of the following statements is FALSE?