Problem Management Process Audit

Is this your test? Login to manage it. If not, you can develop a quiz just like it.

This is a non-interactive preview of the quiz content.

1.
1 point
Where should be the details of a Workaround always be documented?
2.
1 point
Which Problem Management activity helps to ensure that the true nature of the problem can be easily traced and meaningful management information can be obtained?
3.
1 point
For an Incident ticket that is linked with a Problem ticket, the Call ref field should be updated with__________________________.
4.
1 point
A Known Error has been raised after diagnosis of a Problem was complete but before a workaround has been found. Is this a valid approach?
5.
1 point
In which of the following situations should a Problem Record be created?
6.
1 point
How does Problem Management contribute to a higher solution percentage of first-line support?
7.
1 point
Which of the following should be available to the resolve a PMR?
8.
1 point
What is the 1st response time for logging a PMR ticket?
9.
1 point
Which of the following describes the normal sequence of events for fault resolution?
10.
1 point
Which of the following is an example of proactive problem management?
11.
1 point
Which of the following can help determine the level of impact of a problem?
12.
1 point
__ is not part of the PMR ticket?
13.
1 point
If for some reason, SM is not available then___________________act as his/her backup so that there should not be delay in logging or closing the PMR's.
14.
1 point
Which of the following statements correctly states the relationship between urgency, priority and impact?
15.
1 point
Which of the following would a major problem review examine?
1. Things that were done correctly
2. Things that were done incorrectly
3. How to prevent recurrence
4. What could be done better in the future
16.
1 point
KE will be created by ________________.
17.
1 point
When can a Known Error record be raised?
1. At any time it would be useful to do so.
2. After the permanent solution has been implemented.
3. After a workaround has been found.
18.
1 point
Which of the following BEST describes a Problem?
19.
1 point
The Configuration Management System is part of the Known Error Data Base.
20.
1 point
A Process Owner has been identified with an "I" in a RACI matrix. Which of the following would be expected of them?