1.
1 point
Organizational culture is best explained as organizational.
2.
1 point
A good project management system provides for defining the interface between the project team and the organization in all the following areas except
3.
1 point
Organizations have difficulty in creating a system for managing projects because.
4.
1 point
The structure that manages projects within the existing organizational structure is __________ organization.
5.
1 point
Bill is working on a project involving the upgrading of a management information system. The project is being managed by the information systems department with coordination with other departments occurring through normal channels. He is working in a _________ organization.
6.
1 point
Which of the following is an advantage of a functional project management organization?
7.
1 point
Which of the following is a disadvantage of functional project management organization?
8.
1 point
Kim is reviewing a proposed project. The scope of the project is narrow with a lot of in-depth expertise required and it will take a short period of time to complete. The best choice for organizing the project is ________ organization.
9.
1 point
A project team that operates with a full-time project manager as a separate unit from the rest of the organization is structured as a ________ organization.
10.
1 point
Which of the following combinations represents the extremes of project organization?
11.
1 point
MegaComputers, Inc. has assigned a project manager for each of the five new-product teams. The managers as well as the project team members work on the projects on a full-time basis. The structure being used is ________ organization.
12.
1 point
Which of the following structures is referred to in popular literature as a projectized form of organizations?
13.
1 point
Elizabeth is considering how to structure a project team that will not directly disrupt ongoing operations. The project needs to be done quickly and a high level of motivation will be needed in order to do that. For this situation, the ______ organization would be the best choice.
14.
1 point
Projectitis is most likely to occur in the _______ organization structure. A. Functional B. Balanced matrix C. Weak matrix D. Strong matrix E. Project
15.
1 point
Computers R Us is concerned about keeping project costs low and wants to be sure that all pools of expertise are used. Additionally they want to minimize duplication of efforts across projects. Their best choice for project management structure is the _______ organization structure.
16.
1 point
_________ organization is a hybrid form in which a horizontal project management structure is overlaid in the normal functional hierarchy.
17.
1 point
A project management system provides a framework for launching and implementing project activities within a ______ organization.
18.
1 point
In which of the following is the balance of authority strongly in favor of the functional managers?
19.
1 point
The project manager has the responsibility to answer which of the following questions?
20.
1 point
Matrix management violates the management principle of
21.
1 point
All are negotiated issues except:
22.
1 point
The project structure that is ranked as least effective is _______ organization.
23.
1 point
The project structure that is ranked as most effective for developing new products is ______ organization.
24.
1 point
From the list below, which is not a primary characteristic of organization culture?
25.
1 point
Factors in identifying cultural characteristics include all the following except
26.
1 point
Who is responsible for determining how tasks will be done in a matrix project management structure?
27.
1 point
Who is responsible for determining what tasks have to be done in a matrix project management structure?
28.
1 point
The Macintosh development team at Apple is a good example of what kind of project structure?
29.
1 point
The Organizational Culture Diagnosis Worksheet classifies cultural characteristics into all of the following except:
30.
1 point
Which of the following cultural characteristics relates to the degree to which employees identify with the organization as a whole rather than with their type of job or field of professional expertise?
31.
1 point
Which of the following cultural characteristics relates to the degree to which work activities are organized around groups rather than individuals?
32.
1 point
Which of the following is not one of the typical forms of a project management office?
33.
1 point
Which of the following cultural characteristics relates to the degree to which groups within the organization are encouraged to operate in a coordinated or independent manner?
34.
1 point
Which of the following cultural characteristics relates to the degree to which management focuses on outcomes rather than on techniques and processes used to achieve those results?
35.
1 point
The method used to collect information to use through all phases of the project life cycle is called
36.
1 point
Jose is looking at a document that outlines the specific tasks and subtasks required to complete the writing of a technical support manual. The method that was probably used to develop the document is most likely
37.
1 point
The first step in creating the necessary information to manage a project is to
38.
1 point
Linda has just been assigned a project to develop a new advertising campaign for an established product. Her first step should be to
39.
1 point
Research shows the most frequently mentioned barrier to project success is
40.
1 point
An expected output over the life of a project would be classified as
41.
1 point
The first step of project scope definition is to
42.
1 point
In reviewing the project plan, Susan sees that the first prototype is due by October 12. This would be best classified as a
43.
1 point
The ability of 911 emergency systems to identify the caller's phone number and location are considered to be a
44.
1 point
Which of the following is not one of the items that would appear on a project scope checklist?
45.
1 point
"To construct a high-quality, custom home within five months at costs not to exceed $150,000" is best classified as
46.
1 point
The second step in the defining of a project would be to
47.
1 point
Which of the following is not one of the basic classifications of project priorities?
48.
1 point
If a project criterion indicates that the project must meet a specific date, that criterion is classified as
49.
1 point
Scott has just been given a project that has a specific target date. After discussion with top management he finds that while the date is important the cost is more important and a slip in delivery would be acceptable if required to meet the cost targets. The target date is best classified as
50.
1 point
The tool used to assist in making project trade-offs between schedule, budget, and performance objectives is called a