1.
1 point
Select the five types of contract work at DaVita that PKC serves.
2.
1 point
What is "Renal Dialysis"?
3.
1 point
HIPPA is an acronym for: Health Insurance Portability & Accountability Act of 1996. When should you be concerned about watching for violations of this law?
4.
1 point
What does the term "water damage" mean in a medical environment?
5.
1 point
Audits from the State are conducted under Federal guidelines. What is this Federal entity named?
6.
1 point
Blood Borne pathogen training is required by all personnel who work in this sensitive environment. Besides the Certification online, what other preventative medical protection will PKC cover for you?
7.
1 point
What is the difference between a Clean and Dirty sink?
8.
1 point
Which sinks are allowed to use sensor activation and which are controlled by paddles?
9.
1 point
Why are the water faucet controls specifically defined?
10.
1 point
In what areas of a clinic are the floors protected by epoxy?
11.
1 point
What areas of a clinic are required to have washable surfaces (both vertical and horizontal)?
12.
1 point
What type of wallboard or wall finish is permissible to deter water penetration? (select all that apply)
13.
1 point
Are the clinics allowed to store supplies on wooden pallets in the storage areas?
14.
1 point
What is an integral sink and why is it used?
15.
1 point
Overwhelming concern is evident in every clinic when it comes to “infection control”. What does infection control mean to you?
16.
1 point
The majority of clinics in the western US use schedule 80 PVC. What are other acceptable pipe products and where is it legal?
17.
1 point
When should you focus on jobsite cleanup, and who should be performing this important task?
18.
1 point
Where do you post your two week look ahead schedule? Why do we do this? Do your subs get a copy? Who at DaVita gets copied?
19.
1 point
What does the acronym "FA" stand for?
20.
1 point
What is a Bio-Med?
21.
1 point
What does the acronym R.O.D. stand for?
22.
1 point
Who do we (PKC) take direction from on any DaVita project? (select all that apply)
23.
1 point
What is a remediation project?
24.
1 point
What does the acronym P.P.E. stand for?
25.
1 point
Please select all appropriate examples of PPE:
26.
1 point
Where do you use PPE?
27.
1 point
Please select the answer that is most true:
28.
1 point
Time sheet sign in / out forms area available ONLY from the PKC Superintendents
29.
1 point
Project ID badges are available from the clinic Receptionist prior to starting work
30.
1 point
Cleaning solutions and other supplies are provided by the clinic and available in the janitorial area (closet) of each clinic.
31.
1 point
Trash and waste from the project is to be placed in the dumpster provided by DaVita, usually located in the rear of the clinic outside.
32.
1 point
What is the protocol when we un-cover water damage in the course of our scheduled work?
33.
1 point
What is the significance of the RED colored trash cans located on the treatment floors?
34.
1 point
Of the items listed below, which is the MOST important to having a successful project:
35.
1 point
Which of the following are REQUIRED before starting a DaVita project? (select all that apply)
36.
1 point
If the Facility Administrator does not like the paint colors and notifies us in writing, we must make the changes and report back to the Project Manager if there is any additional charge.
37.
1 point
From time to time, a Remediation Vendor may need to provide us with detailed instructions about how to build-back a mold-remediated area. We will take direction from them ONLY as it relates to the remediated area of the clinic.
38.
1 point
Your Daily Report Photos should contain which of the following: (select all that apply)
39.
1 point
The weekly conference call is mainly for the purpose of:
40.
1 point
When obtaining lead times for materials, equipment, and owner provided items, you should always...
41.
1 point
When a job is completed, what must be done before leaving the jobsite?
42.
1 point
Who is allowed to sign sub-contractor work tickets in the field?