Deploy the AN/TSC-167 Satellite Transportable Terminal

Is this your test? Login to manage it. If not, you can generate a test just like it.

This is a non-interactive preview of the quiz content.

1.
1 point
All circuit breakers must be set to the off position prior to powering up the on board generator?
2.
1 point
What type of cable is used to connect with the J1 and J2 ports on the STT?
3.
1 point
How many degrees within level must the STT be in order for the terminal to successfully track satellites?
4.
1 point
What are the power sources that the STT can use?
5.
1 point
In what direction must the STT be placed?
6.
1 point
What is something that is checked during the pre-start up checks of an STT?
7.
1 point
STT trailer wheels must be elevated off of the ground during normal operation?
8.
1 point
What is the minimum distance that the Radiation Hazard Barrier must extend from the terminal?
9.
1 point
How many stabilizer pads are used on the STT?
10.
1 point
The STT can only be grounded using a "star ground" grounding kit?