Asurion Exam 5

Is this your test? Login to manage it. If not, you can develop an exam just like it.

This is a non-interactive preview of the quiz content.

1.
1 point
What is the main purpose of SQA IM team?
2.
1 point
If I need to make a change to a QA RFC after the cutoff time for the scheduled window, I can put it on hold, make the change, and resubmit to have it deployed in the same window.
3.
1 point
Which of these is NOT a release cycle type in Quality Center?
4.
1 point
When testing is done, all defects are in an end state and code has not been deployed to production, the release status should be
5.
1 point
Match the release type with its definition: OnCycle
6.
1 point
Match the release type with its definition: OffCycle
7.
1 point
Match the release type with its definition: Hotfix

*NOTE* Answer is in error. Correct answer is C.
8.
1 point
A release can have more than one Test Cycle of type System Test
9.
1 point
With the exception of a Non Prod Release, QA RFCs do not require a Master RFC to be populated on the release before deploying code to the QA environment.
10.
1 point
The Change Approval Board, CAB, requires a code freeze of _____ hours before a production deployment.
11.
1 point
Only someone in SQA can create and submit a SQA RFC.
12.
1 point
RFC is an acronym for:
13.
1 point
Indicate all QC modules from which a defect can be created.
14.
1 point
The Test Cycle groups the tests to be run.
15.
1 point
A release can have more than one production RFC.
16.
1 point
Most defect updates can be made through the SQA Dashboard.
17.
1 point
For SQA Tools weekend support you must submit a request to SQATools@asurion.com by Friday’s at 4:00pm CST
18.
1 point
For all SQA tool support needs, you should use the “Request Support” button found on the dashboard
19.
1 point
A defect is:
20.
1 point
What is required in the comments prior to the deferral of a defect?
21.
1 point
Once a defect has been marked Closed, Deferred, or Invalid it can be re-opened without creating a JIRA ticket for the SQA Tools team.
22.
1 point
In software, design is cheap and building is expensive.
23.
1 point
With Test Driven Development there is a larger focus on Unit Testing with reduced reliance on UI testing.
24.
1 point
Cucumber, as it relates to software development tools, is a...