1.
1 point
The emergency discharge should be operated
2.
1 point
To prevent liquid refrigerant from being carried to the compressor,
3.
1 point
In what state is the refrigerant entering the condenser?
4.
1 point
The discharge of a pressure relief valve must be _____________ meters above the ground.
5.
1 point
A lack of refrigerant charge in the system, is indicated by a
6.
1 point
What is the minimum required relief capacity, in kg/min, of a relief valve on an ammonia receiver 1m in diameter and 2m long?
7.
1 point
Overpressure protection is not required on vessels with an internal diameter less than
8.
1 point
Refrigerant piping that crosses passageways shall be not less than ________ above the floor.
9.
1 point
A new refrigeration system is placed under a vacuum to
10.
1 point
Vessels with an internal gross volume of 0.28 m3 or more shall have:
11.
1 point
Receivers used to carry the full charge should have a sufficient capacity without the liquid occupying more than:
12.
1 point
The minimum low side design pressure of an ammonia system is
13.
1 point
Liquid level gage glasses on refrigeration receivers must be fitted with
14.
1 point
When charging a refrigeration system
15.
1 point
How much ammonia does a standard cylinder hold?
16.
1 point
During normal operation, how often should the suction line strainer be cleaned?
17.
1 point
Piping for ammonia systems is normally
18.
1 point
The maximum amount of refrigerant, besides the charge that may be stored in the machinery room, is
19.
1 point
What is placed alongside the emergency valve?