1.
1 point
1. The first step in Quality Function Development is to determine the customer attributes. The second step in QFD is to translate the customer attributes into target
2.
1 point
2. "Lean Operations" refers to the task of reducing the defect rates in a firm's products or services.
3.
1 point
Product design supports the business strategy.
4.
1 point
4. A bill of materials can be coupled with a bill of labor if MRP systems are to be used in service industries.
5.
1 point
5. A process will generally have at least one bottleneck.
6.
1 point
6. If there are multiple resources that process each transaction, then the process capacity is the sum of all the individual capacities of the resources.
7.
1 point
7. Market pull is the best way to introduce new products.
8.
1 point
8. Order launching MRP systems are also known as Type II MRP systems.
9.
1 point
9. The master schedule is prepared for product families.
10.
1 point
10. In supply chain improvement, it is often necessary to reduce the setup time of equipment dramatically so that smaller lots of the product can be economically produced.
11.
1 point
11. The process view provides a basis for viewing an entire business as a system of interconnected processes.
12.
1 point
12. With the technology push view of new-product introduction, technology and the market equally determine which products a firm should make.
13.
1 point
13. It is bad to have a negative cash-to-cash cycle in which the firm receives payment before it pays its suppliers.
14.
1 point
14. A line of visibility separates the parts of a service that come in direct contact with customers from those that do not.
15.
1 point
15. The Economic Order Quantity model is extremely useful while making decisions on order quantities in MRP systems.
16.
1 point
16. Delivery has three performance measures: on-time delivery, fill rate, and unit cost.
17.
1 point
17. ISO 9000 requires that a new-product development process be defined and followed by a company.
18.
1 point
18. MRP systems work better in a line flow system compared to a job shop.
19.
1 point
19. In MRPsystems, inventories are managed according to their dollar usage values (i.e., high dollar usage inventories are more carefully managed compared to low dollar usage inventories).
20.
1 point
20. Misalignments between operations and product design can occur in technology, infrastructure, and rewards systems.
21.
1 point
21. Final consumers can be found farthest downstream in the supply chain.
22.
1 point
22. Forecasting demand in MRP Systems is based on the past demand patterns for components.
23.
1 point
23. A process view emphasizes that it is important for a business to function as independent silos.
24.
1 point
24. Major product redesign is often needed to make infrastructure improvements in the supply chain.
25.
1 point
25. As price increases and benefits remain constant, the value of a product increases.
26.
1 point
26. Demand chain management tries to match supply and demand.
27.
1 point
27. One of the major benefits of concurrent engineering is the reduction in time to complete the new-product development process.
28.
1 point
28. When a company uses an ERP system, the different functional areas of the business will share a common database.
29.
1 point
29. Modular design offers new opportunities for product and process design.
30.
1 point
30. The master schedule should be frozen inside the production lead-time.
31.
1 point
31. Process redesign tends to be cross-functional in nature and requires a complete overhaul of work methods, flows, and information systems.
32.
1 point
32. The objective of structural and infrastructure changes is the same: To remove sources of uncertainty, to reduce replenishment time, and to reduce total cost of supplying the market.
33.
1 point
33. The transformation view of the Operations function provides a unified approach for studying the manufacturing and service industries.
34.
1 point
34. Best practices in operations are best for all organizations.
35.
1 point
35. MRP is a type of pull system.
36.
1 point
The design and management of seamless, value-added processes across organizational boundaries to meet the real needs of the end customer is called:
37.
1 point
Quality Function Deployment:
38.
1 point
If a factory has 100,000 units of materials in the system and if the average flow rate of the system is 5000 units per day, then according to Little's Law, the average throughput time is:
39.
1 point
What does a square or rectangle symbol indicate in a flowchart?
40.
1 point
Which type of MRP system is used as an information system to plan and control inventories and capacities?
41.
1 point
Successful MRP implementation requires:
42.
1 point
Backward or upstream supply chain flows include:
43.
1 point
In MRP "scheduled receipts" are:
44.
1 point
The three inputs for an MRP parts explosion are:
45.
1 point
Cycle counting:
46.
1 point
46. The master production schedule for Product A shows a need for 30 units, and Product B shows a need of 25 units. To manufacture a unit of Product A, three units of component C are required. To manufacture a unit of Product B, four units of component C are required. Determine the gross requirements for component C to complete production.
47.
1 point
A diamond symbol in a flowchart indicates:
48.
1 point
Materials handling, transportation, and warehousing are elements of:
49.
1 point
Which of the following is true about MRP Systems?
50.
1 point
Which of the following does the Supply Chain Operations Reference (SCOR) model NOT include?