processquality

Is this your test? Login to manage it. If not, you can generate a quiz just like it.

This is a non-interactive preview of the quiz content.

1.
1 point
Manual testing has more control than automation testing
2.
1 point
What does ETVX means
3.
1 point
Identifying business needs/concerns/high level requirements in the mind of customers. This is done in which stage
4.
1 point
Which is not associated with testing
5.
1 point
Which of the following is eg of peer review
6.
1 point
Project information stored in
7.
1 point
Project management involves balancing which of the following factors
8.
1 point
Quality management system management responsibility Resource management, product realization are the section of
9.
1 point
Risk management is done at which stage
10.
1 point
Which of the following is proactive
11.
1 point
Activities in a phase corresponds to
12.
1 point
BS 7799 Information is one of the most valuable assets owned by Cognizant
13.
1 point
If there is change in request, traceability matrix is referred for impact analysis
14.
1 point
Cognizant and Peer review comments are done by
15.
1 point
Code coverage is a measure used in software testing which is used to ascertain a part of a program that does not exercise test cases.
16.
1 point
Which of the following is not an automation tool
17.
1 point
AVM projects use this tool to log the activities and to track adherence
18.
1 point
What data design does
19.
1 point
If the requirement and design document is given by the client, with what stage will the project start
20.
1 point
E-tracker and Prolite are used in which phase
21.
1 point
Project quality goals are found in
22.
1 point
Coding is ______ of SDLC
23.
1 point
Six sigma is 99.9997 error free code
24.
1 point
Junit is a type of white box testing tool
25.
1 point
The entire process of ensuring quality is known as
26.
1 point
is an analysis is an approach for doing an accurate estimation of functional testing projects
27.
1 point
Which sdlc model have separate and distinct phase of specification and developement
28.
1 point
Performance testing includes
29.
1 point
Cognizant defect tracking is stored in
30.
1 point
is a testing tool used for testing the scalability, functionality, and performance of Web-based applications, such as Internet and Intranet