Assessment

Is this your test? Login to manage it. If not, you can build an exam just like it.

This is a non-interactive preview of the quiz content.

1.
1 point
The lead or lag is expressed as a ________ of the duration of the driver task (predecessor).
2.
1 point
This is the most important Document and is referred through out all the phases of the SDLC process.
3.
1 point
Accenture relies on ________ bringing the best of their experiences, educational backgrounds, and skills to perform the diverse work we do.
4.
1 point
What are the different facilitator skills?
5.
1 point
In CO Module, a Company Code is NOT assigned to many controlling areas.
6.
1 point
The Accenture Delivery Methods cover four major areas:
7.
1 point
Development Repositories belongs to ...?
8.
1 point
What computer software program to manage projects?
9.
1 point
What is the meaning of ABAP?
10.
1 point
What are the different ADM Implementation methods?
11.
1 point
_______ is about whether clients think you are dependable and can be trusted to behave in consistent ways.
12.
1 point
Can a transparent table exist in data dictionary but not in the database physically?
13.
1 point
___________ is a structured way of validating the requirements and specifications
14.
1 point
These are the resources which perform various functions in the SDLC process while following the Accenture Guidelines and check lists.
15.
1 point
In which transaction we can create a program?
16.
1 point
_________ is a programming language for developing applications for the Systems, Application and Products in Data Processing R/3
17.
1 point
What is the transaction code when creating a SAPScript?
18.
1 point
The New Golden Rule:
"Do not do unto others as you expect they should do unto you. Their ________ may not be the same."
- George Bernard Shaw 
19.
1 point
These are the templates created and used by the resources during the SDLC life cycle. By using these templates or work products, the team will creates the Business Processes.
20.
1 point
People are best asset?
21.
1 point
What does CORBIS stands for?
22.
1 point
____________ are the repository of Harvested Bench Marks for the projects.
23.
1 point
________ was customized to meet the specific needs of engagements that leverage the capabilities.
24.
1 point
Deliver ongoing services across application management, technology infrastructure, and business processes.
25.
1 point
Which social style exhibits more controlling responsive behavior
26.
1 point
Which is NOT a primary role in the peer review process?
27.
1 point
To avoid pitfalls, it is critical to be prepared.
28.
1 point
This relates to creating the Test Plan for the Project. Based on the test plan, all the tests are designed for the project. Generally the Test Plan created at the beginning of the project and compliance will be ensured during the testing phase of the project.
29.
1 point
Credibility is not just content expertise.
30.
1 point
Check ALL that applies
31.
1 point
Which transaction code to create data elements?
32.
1 point
____________ Drive discipline and broad-based oversight to ensure that value is delivered.
33.
1 point
At Accenture, we define ________ as that action or quality that inspires trust by taking responsibility, acting ethically, and encouraging honest and open debate
34.
1 point
What is the smallest organizational unit in organization structure of SAP?
35.
1 point
Can we create a table field without referring to a data element?
36.
1 point
Which social style exhibits more controlling responsive behavior
37.
1 point
The ADM uses standard methods and enables us to move the work to the most capable and cost-effective location(s), through:
38.
1 point
SAP is an example of a custom development program.
39.
1 point
Accenture Delivery Suite is composed of - Accenture Delivery Methods, Accenture Delivery Process, Accenture Delivery Tools, Accenture Delivery Metrics.
40.
1 point
What is the meaning of SAP?
41.
1 point
Who Can Perform Peer Reviews?
42.
1 point
This test is conducted by the developers or configurators for the tasks that they build or develop in the Build phase of the SDLC process.
43.
1 point
Not only do we have to manage the _________ of our people, but the internal workforces of our global organization as well.
44.
1 point
Which is NOT a type of object in ABAP?
45.
1 point
Which is NOT a module in SAP
46.
1 point
Which of the following is true?
47.
1 point
_____________ is the system that integrate data into centralized database for every business processes can get into the database easily.
48.
1 point
______ provides existing bug fixes, SAP enhancements, and consulting tips
49.
1 point
What are the different TYPES of meeting?
50.
1 point
Which doesn't comprises ADM