1.
1 point
What is the correct sequence for loading the skip of a concrete mixer?
2.
1 point
What do you do to bricks if you must lay them in cold weather?
3.
1 point
Which of the following concrete joints should you cut into a concrete slab to create a plane of weakness, which force cracking at the joint
4.
1 point
When must you install bracing on batterboards?
5.
1 point
When using a pope sleeve anchor bolt, how do you keep concrete from entering the sleeve?
6.
1 point
When the temperature is at or above 50 degrees F, you should cure concrete for at least how many days?
7.
1 point
What action can you take to close hairline cracks (checks) that developed due to a concentration of water and extremely fine aggregates at the surface?
8.
1 point
Which of the following concrete joints should you use to separate adjacent structural members to allow differential movement in the vertical plane?
9.
1 point
Which type of cement should you use when the concrete must reach its design strength is seven days or less?
10.
1 point
You should begin the edging operation
11.
1 point
When performing a slump test, how should you fill the cone?
12.
1 point
What is the minimum/maximum time you should mix the mortar when machine mixing?
13.
1 point
When splicing welded wire fabric, a normal splice made by lapping
14.
1 point
How should you tool mortar joints on a concrete masonry wall?
15.
1 point
When using 1 inch lumber for slab forms, at what approximate distance should you drive stakes along the board?
16.
1 point
When constructing large structures where moderate heat of hydration is needed, what type of cement should you use when it must reach its design strength in about 45 days?
17.
1 point
When using epoxy cement to repair concrete, what is the minimum thickness you can apply it and still retain good strength without cracking?
18.
1 point
How do you form any square or rectangular dimensioned slab using metal forms?
19.
1 point
Which of the following procedures is used to make a Michigan control joint in a concrete masonry wall?
20.
1 point
Which of the following actions is used to the strike off the excess concrete to bring the surface to its proper elevation?
21.
1 point
When constructing pavements, sidewalks and reinforced concrete buildings, which type of concrete should you use when it must reach its design strength in about 28 days?
22.
1 point
As a practical guide, you should discard any mortar not used within
23.
1 point
How do you chase the bond for a concrete masonry wall?
24.
1 point
When constructing a concrete masonry wall, what action should you take after you locate the corners?
25.
1 point
When excavating around the outside wall planes, how much working space should you allow for form construction?
26.
1 point
When using 2 inch lumber for slab forms, at what approximate distance should you drive stakes along the board?
27.
1 point
In batterboard construction, how do you hold the building lines securely in place?
28.
1 point
When installing lintels, what is the minimum amount of bearing that you should provide at each end?
29.
1 point
Estimate the amount of course aggregate needed to mix one cubic yard of concrete when specifications call for a 1:2:3 mix using 3 inch course aggregates
30.
1 point
How do you reinforce studs that extend over four or five feet when constructing wall forms?
31.
1 point
When reinforcing beams, footings, walls and floors, what should be the minimum clear distance between parallel bars?
32.
1 point
Using Rule 38, estimate approximately how much cement and sand is needed for a 1:4 mix ratio
33.
1 point
When hand mixing concrete, which of the following procedures is correct?
34.
1 point
When constructing a new ramp, you must ensure the ramp's width is not
35.
1 point
When hand mixing mortar, what method allows the blending process to take place easier and quicker?
36.
1 point
When grade stakes are used between wooden footing forms, what action must you take before the concrete sets?
37.
1 point
When laying a brick windowsill, what type of course is used?
38.
1 point
Estimate the amount of sand needed to mix one cubic yard of concrete when specifications call for a 1:2:3mix using 3 inch course aggregates
39.
1 point
When using waterproof paper to cure horizontal concrete surfaces, you should lap the adjacent sheets at least how many inches?
40.
1 point
When the temperature is at or above 70 degrees F, you should cure concrete for at least how many days?
41.
1 point
When constructing a footing for a bearing wall, how are the sides held in place with the correct distance maintained between them?
42.
1 point
What action can you take to ensure that all the face bricks received at the job site are uniform in quality, size and color?
43.
1 point
When pouring concrete in the layers, how far should you insert an internal vibrator into the previous layer and why?
44.
1 point
What is the first step in locating corner stakes for a bulding?
45.
1 point
When specifications require a No. 5 rebar, what is the actual needed?
46.
1 point
What type of mortar should you choose for general use work, specifically for below-grade masonry that contacts the earth, such as foundations?
47.
1 point
When constructing footings and other structural members that are against the ground, how much space should you allow between the steel and the ground?
48.
1 point
You can tell the concrete has been vibrated long enough with an internal vibrator when a
49.
1 point
Once the bulding corners are square, what is the next step taken when preparing a site for concrete?
50.
1 point
How high should you build the corner leads?