McCann/Tomes Training Quiz

Is this your test? Login to manage it. If not, you can create an exam just like it.

This is a non-interactive preview of the quiz content.

1.
1 point
What is the best method of surface preparation prior to installing McCann ProFlow?
2.
1 point
What is the concern with acid washing for surface preparation?
3.
1 point
What should be used to apply McCann ProFlow Primer?
4.
1 point
How long should McCann ProFlow be mixed?
5.
1 point
On what types of projects can you recommend McCann ProFlow? (Mark all correct answers)
6.
1 point
Which product should be recommended for horizontal use if any pitching, sloping or ramping is needed?
7.
1 point
Which product has polymer?
8.
1 point
Which product has more flow?
9.
1 point
When mixing P-38 and P-51, why is it recommended to let the product rest for 30 seconds in the middle of mixing?
10.
1 point
What causes patches to crack/pull away from the edges of the repair area?
11.
1 point
In how cold of an environment can 10 Minute Concrete Mender be applied?
12.
1 point
When repairing a crack, which should be applied into the crack first?
13.
1 point
10 minutes after the application of 10 Minute Concrete Mender at 70 degrees, you can: (Mark all correct answers)
14.
1 point
B-1 Rebar Coating uses zinc-based technology
15.
1 point
How long after the application of B-1 can the contractor wait to apply repair material to the primed bar?
16.
1 point
Which of the following is true about B-1 Rebar Coating?