1.
1 point
It measures the quality of processes used to create a quality product. It is a system of management activities, It is a preventive process, It applies for entire life cycle & Deals with Process.
2.
1 point
Boundary value analysis belongs to which testing method?
3.
1 point
Сколько времени потратить на изучение?
4.
1 point
To check whether we have developed the product according to the customer requirements r not. It is a Dynamic process
5.
1 point
Automation Testing should be done before starting Manual testing
Is the above statement correct?
6.
1 point
Which is Black-Box Testing method?
7.
1 point
What do you mean by “Having to say NO”
8.
1 point
The review and approved document (i.e. Test plan, System Requirement Specification’s) is called as
9.
1 point
To check whether we are developing the right product according to the customer requirements are not. It is a static process
10.
1 point
Какие виды тестирования вы будете применять и почему?
11.
1 point
Typical defects that are easier to find in reviews than in dynamic testing are:
12.
1 point
Вам нужно получить дизайн новой страницы, но ваш дизайнер сказал вам что сможет приступить к задаче не раньше чем через 4 дня. Ваши действия:
13.
1 point
Reviews, static analysis and dynamic testing have the same objective
14.
1 point
Стоит ли писать тест-план?
15.
1 point
Когда писать тестовую документацию?
16.
1 point
Load Testing Tools:
17.
1 point
Executing the same test case by giving the number of inputs on same build called as
18.
1 point
Вы знаете, что на изучение спецификации вам нужно потратить около 4 часов, так как задача очень большая. Когда приступить к изучению требования? Сразу? Ваши действия (учтите, что вы работаете в условиях полного недосыпания и загруженности)
19.
1 point
Conducted to validate that the application, database, and network they may be running on can handle projected volumes of users and data effectively. The test is conducted jointly by developers, testers, DBA’s and network associates after the system Testing called as
20.
1 point
What are the Types of Integration Testing?
21.
1 point
Cost of quality = Prevention Cost + Appraisal cost + Failure cost
22.
1 point
The selection of test cases for regression testing
23.
1 point
What are the 2 major components taken into consideration with risk analysis?